North Quay

Hull

Following our success at Saltend Jetty, VolkerLaser were commissioned to carry out concrete repair and carbon fibre works to the North Quay at King George docks in Hull.

Built predominantly as a suspended quayside, North Quay consists of a series of bays on which cranes stand to unload cargo.

Using hydrodemolition, VolkerLaser set to work repairing the defective sections of crane beams in each of these bays. Additional reinforcement and anodes were installed and the repair was carried out using Sika 133F spray applied concrete.

Learn more about this project?

Contact enquiries@volkerlaser.co.uk »

Related projects

All projects
+